Irrigation monitoring: a 7-day sensor and approval plan
Five tasks to map devices, preserve data-quality flags and record human decisions. Provides registry and decision-log templates without irrigation commands or universal thresholds.
License: cc-by-4.0
irrigation, sensor, veri-kalitesi, insan-onayi
Overview
Irrigation monitoring: a 7-day sensor and approval plan
Goal and required inputs
Produce an auditable sensor-to-field registry, a quality-aware monitoring view and a human decision log. Bring your real device's installation/calibration instructions, field identity, measurement depth, sampling interval, clock/time zone and an authorized operator. Define the farm's locally approved decision procedure separately. VWC (%) and water potential (kPa) are different quantities; this plan supplies no conversion, threshold, water volume or runtime.
Procedure
- Choose Adapt to my program to create a private farm program; edit days and approved inputs, preview selected fields/start date before creating tasks, and inspect the five tasks: mapping day 0, inspection day 1, baseline day 2, decision day 4, review day 7.
- Match each real probe to a field, depth and documented unit. Confirm the displayed time and sampling interval against the device.
- Inspect installation, power and connection using the manufacturer's procedure. Mark missing, flat or implausible readings for investigation.
- Show quality flags with the signal. Break a chart line at missing VWC; keep suspect readings identifiable rather than deleting them.
- Record an authorized person's decision and rationale. A review task is not an irrigation order. Use an existing local operating procedure only if an actual action is approved.
Deliverables and acceptance criteria
Create private probe-registry.csv: sensor_id,field_id,model,depth,depth_unit,quantity,measurement_unit,timezone,sampling_interval,installation_check. Create decision-log.csv: decision_id,field_id,decision_time_with_timezone,evidence_window,data_quality,decision,approver_alias,rationale,actual_action_reference.
Accept the monitoring view when every signal resolves to one registry entry, units/time zones are explicit, missing values remain empty/null and suspect flags survive export. Accept a decision record only with an approver and reason; 'defer pending inspection' is a valid recorded outcome. Keep sensor faults separate from agronomic judgments.
Worked example and next action
Download synthetic sensors: two fictional fields, 72 hourly records each, 138 ok/4 missing/2 suspect overall. sensor-a-017 has missing VWC; sensor-a-035 has the intentionally suspect value 99. Check that both states survive a CSV/JSON round trip and chart export. These values cannot justify a real watering decision. Close the cycle with a fault list and a separately approved next monitoring visit, not a savings claim.
Privacy, provenance and license
Keep real device IDs, locations, credentials and named staff out of public examples. Use the synthetic fixture for parser demonstrations. AgriDigi authored this operational template; manufacturer and local instructions remain controlling inputs. Original text/tasks are CC BY 4.0: credit AgriDigi, link the original and license, and describe adaptations. No automated-control safety, water savings, yield or chemical recommendation is asserted.
Field checks for irrigation sensors and water distribution
Use this companion with the capsule’s mapping, inspection, baseline, decision and review tasks. The seven days organize an example review. The actual monitoring interval depends on the crop stage, system, weather, soil or substrate and locally approved procedure. The evidence comes from two questions. How does water reach the irrigated zone? How does water content change where it is observed? Answer each question with measurements whose location, timing and method are known.
Select the monitoring zone and installation positions
Record the field, crop cycle, irrigation zone, equipment and distribution layout. Separate materially different textures, rooting depths or management conditions when they affect interpretation. Place observation points using the relevant crop stage and expected active roots. For drip, record the distance and direction from the row and emitter. A probe in a wetted bulb and another outside it can respond differently after the same event. Repeatable positions help explain the difference. For an orchard record the tree or rootstock block and emitter layout. For protected crops also record whether the probe measures mineral soil or a specific growing medium. The calibration appropriate for one medium may give a biased result in another.
Record probe model, measurement principle, depth and reference surface, orientation, installation date, serial identifier and calibration used. Follow the manufacturer’s installation instructions and check soil contact and air gaps. Preserve the raw reading alongside any corrected or converted value. Some electromagnetic sensors infer volumetric water content from the medium’s dielectric response. Texture, salinity, bulk density and temperature can affect that estimate depending on the model. Use an appropriate site reference or the locally accepted calibration check when readings will support decisions. Reinstallation or a calibration change can break the comparability of the time series. Record the date of the change. Sensor selection and installation
Check what the reading represents
Volumetric water content describes water volume divided by bulk soil volume. Store it explicitly as a fraction or a percent. Preserve the sign convention on a tension or matric-potential measurement in kPa. The relationship between that quantity and water content depends on the soil’s retention characteristics. A sensor at a single depth and point samples a limited volume. A zone estimate requires a design that represents the depths and locations in question.
If the values represent layer-average volumetric water content, the change in equivalent water depth is the sum of each fraction change times its layer thickness. Express thickness in metres and multiply the result by 1,000 to report millimetres. In a synthetic one-layer exercise, a 0.30 m layer changes from 0.22 to 0.25 as a volumetric fraction. The change is 0.03 × 0.30 × 1000 = 9 mm. This is a storage change in the specified fictional layer. Attribution to irrigation would require evidence about rainfall, crop use, flow across the layer boundary and the timing of observations. A shallow response followed by a deeper response can be consistent with wetting. Quantifying drainage requires additional measurements or a justified model. Root-zone water balance
Measure emitter discharge and calculate the lower quarter
Use the farm’s approved evaluation procedure and safe operating conditions. Define which zone and outlet type are represented. Choose locations that cover the distribution layout, including heads and ends of lines, elevation differences and suspected problem areas. Record targeted fault checks separately when estimating typical performance. Use stable operating conditions and document the pressure and the active zones. Record each outlet identifier, location, collected volume, elapsed time and collection quality. If a container spills, mark the sample invalid. A verified no-flow outlet is a zero observation and remains in the sample when it is in scope. Avoid unsafe access to moving or pressurized equipment and follow the operator’s procedure. Microirrigation pressure and discharge evaluation
For the synthetic example, eight outlets have equal sampling weight and the same 10-minute collection time. The collection interval is an invented measurement input. Convert millilitres to litres and minutes to hours before calculating discharge.
| Fictional emitter | Collected (mL) | Discharge (L/h) |
|---|---|---|
| P1 | 140 | 0.84 |
| P2 | 130 | 0.78 |
| P3 | 100 | 0.60 |
| P4 | 150 | 0.90 |
| P5 | 130 | 0.78 |
| P6 | 110 | 0.66 |
| P7 | 120 | 0.72 |
| P8 | 120 | 0.72 |
Sort the sample by discharge and average the lowest quarter. Here the lowest two volumes are 100 mL and 110 mL. Their mean is 105 mL and the mean of all eight is 125 mL. The lower-quarter distribution uniformity is 105 / 125 × 100 = 84%. Equal durations allow the volume ratio here. Use rates when valid durations differ. The same arithmetic with the low-quarter and overall discharges is 0.63 L/h divided by 0.75 L/h. The sample size, duration, rates and result are synthetic teaching inputs and results. For a real zone use a suitable sampling design and a locally accepted method for weighting and handling sample sizes that do not divide into quarters. If the overall measured rate is zero, the ratio is undefined. Lower-quarter distribution uniformity
Distinguish distribution, storage and efficiency
The outlet measure describes variability of delivered discharge among sampled outlets. It leaves soil wetting, storage, runoff and deep movement to other observations. A center pivot uses a different sampling geometry. Record collector placement, distance from the pivot, pressure, wind and operating configuration, and use an applicable distance-weighted calculation. The simple eight-outlet calculation above does not describe pivot performance. Center-pivot collector testing
Application efficiency uses water from irrigation stored in the root zone over the amount delivered to a defined field boundary. It depends on the measurement period, system operation and soil response. The synthetic 84% distribution-uniformity result supplies no application-efficiency estimate. Enter a separately supported efficiency if a water-balance scenario needs one. A field-boundary change in delivered water also has a different meaning from a change in consumptive use across a basin. Application efficiency and water recovery
Leave an auditable decision record
Link the sensor and delivery observations to the same zone, crop cycle, event and explicit time interval. Include the water meter or flow source, pressure readings, weather, valid observations, missing and suspect flags, method version and responsible reviewer. An estimate computed from calibrated data should retain its input records and assumptions. If a sensor value jumps without supporting observations, investigate placement, calibration, timing and delivery before reaching a field decision. Record planned and actual operations separately. Keep the method, decision and next verification step available for review.
All worked-example inputs and results are synthetic. Local review determines actual thresholds, test design, pressure settings and irrigation decisions. This original AgriDigi companion explains how to document those decisions and their evidence.
Related AgriDigi capsules
Action plan
Crop: Crop independent · Duration: 7 days
Create the device–field–unit registry
Day 0
Record each real device's ID/model, field, depth, quantity/unit, time zone and sampling interval from its documentation. Deliver probe-registry.csv plus the manufacturer's instruction reference. Accept only unambiguous mappings; VWC and kPa are not interchangeable. Keep synthetic devices separate and do not expose credentials or real locations publicly.
Inspect installation and isolate data-quality faults
Day 1
Use the manufacturer's procedure to check placement, power, connection and calibration status. Compare device and displayed times; flag missing, flat or unexpected readings. Deliver a fault list with owner and next check. Accept when missing readings remain empty/null and faults are explicit; a missing value is not zero moisture.
Build a quality-aware monitoring baseline
Day 2
Display signal time and quality together; break missing-value chart segments and retain suspect markers through export. Deliver a saved view and a CSV/JSON quality check. Accept when units/time zone are visible and source flags survive. Locally authorized experts determine any real threshold; this example supplies none and must not enable automatic control.
Record an authorized human decision and its evidence
Day 4
Have the authorized person consider current field observations, reliable readings and the farm's approved method. Record decision time, quality, approver and rationale in decision-log.csv, including any deferral. Accept only a documented decision; this task does not order irrigation or prescribe amount/runtime. Approved actions follow the real local procedure.
Review outages, faults and decisions separately
Day 7
Summarize interruptions and unresolved faults separately from human decisions. Confirm all four missing and two suspect synthetic records remain identifiable in test exports. Deliver an exception summary and approved next monitoring task. Accept when each unresolved fault has an owner and no synthetic signal is reported as real performance or savings.